PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 221–230 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Installation of street lights along Calapan south road K0047+200 - K0060+800, Socorro, Oriental Mindoro | Socorro | 2025 | Isinasagawa | ₱96,458,354 |
| Road widening of secondary roads, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), Bansud, Oriental Mindoro | – | 2018 | Tapos na | ₱96,401,466 |
| Flood control · Brgy. Camansihan Construction of flood control structure, barangay camansihan, Calapan city, Oriental Mindoro | Calapan City | 2025 | Isinasagawa | ₱96,208,515 |
| Flood control · Brgy. Gutad Construction of flood control structure, barangay gutad, Calapan city, Oriental Mindoro | Calapan City | 2025 | Tapos na | ₱96,150,333 |
| Rehabilitation of nauhan beach road, pagkakaisa - bagong buhay road and pinahan - buhangin - nag-iba road, Naujan, Oriental Mindoro (phase 2) | Naujan | 2025 | Isinasagawa | ₱96,029,302 |
| Rehabilitation of sugui - palhi road, tibag - pachoca - wawa road, Calapan city, Oriental Mindoro (phase 2) | Calapan City | 2025 | Isinasagawa | ₱96,003,086 |
| Flood control · Brgy. Managpi Construction of flood control structure, barangay managpi, Calapan city, Oriental Mindoro | Calapan City | 2025 | Isinasagawa | ₱95,981,063 |
| Flood control project, Naujan, Oriental Mindoro | Naujan | 2017 | Tapos na | ₱95,579,343 |
| Flood control · Brgy. Tigkan section Basic infrastructure program (BIP)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio dalia, brgy. tigkan section, Naujan, or. Mindoro | Naujan | 2024 | Isinasagawa | ₱95,436,320 |
| Construction of flood control structure, longos bridge 1ST approach, downstream, Calapan city, Oriental Mindoro | Calapan City | 2025 | Isinasagawa | ₱95,151,691 |