PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
270
ayon sa napiling filter
PUBLISHED NA BUDGET
₱12.02 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
94%
253 sa 270 proyektong may katayuan
LOKASYON
270 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike, bry. dulangan, pto. galera, Oriental Mindoro | 2023 | ₱247,496,508 |
| Basic infrasructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (paitan section), or. Mindoro | 2023 | ₱247,496,307 |
| Basic infrastucture program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/failities- const. of road dike along dulangan river, (metolza section), or. Mindoro | 2023 | ₱247,495,816 |
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (evangelista section), Oriental Mindoro | 2023 | ₱247,494,945 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities-const. of dike along dulangan river, sitio bayanan, Naujan, or. Mindoro | 2023 | ₱241,246,776 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, paitan section, Naujan, or. Mindoro | 2023 | ₱241,246,569 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, evangelista section, Naujan, or. Mindoro | 2023 | ₱241,246,196 |
| Sustainable infrastructure projects alleviating gaps (sipag)-flood mitigation structures protecting public infrastructures/facilities- const. of dike along dulangan river, sitio bagong buhay, Naujan, or. Mindoro | 2023 | ₱241,245,363 |
Ipinapakita ang 11–20 sa 270, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Interjurisdictional roads and/or bridges (or, roads that traverse multiple lgu jurisdictions)- construction of ranzo-bacawan-buhay na tubig-calima road, Pinamalayan-Pola, or. Mindoro | – | 2023 | Isinasagawa | ₱238,215,288 |
| Flood control · Brgy. Tagumpay Sustainable infrastructure projects alleviating gaps (sipag) flood mitigation structures protecting public infra./facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio ginhawa sect., brgy. tagumpay, Naujan, or. Mindoro | Naujan | 2023 | Tapos na | ₱221,948,493 |
| Sustainable infrastructure projects alleviating gaps (sipag) flood mitigation structures protecting public infrastructures/facilities- const. of Roxas by-pass road, Roxas, or. Mindoro | Roxas | 2023 | Isinasagawa | ₱221,946,011 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, anilao-mina de oro sect., Bongabong, r. Mindoro | Bongabong | 2023 | Tapos na | ₱217,123,307 |
| Flood control · Brgy. Inarawan Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio bagong pook section, brgy. inarawan, Naujan, or. min | Naujan | 2023 | Tapos na | ₱217,123,234 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, morente-lisap section, Bongabong, or. Mindoro | Bongabong | 2023 | Tapos na | ₱217,123,082 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along Bongabong river, san isidro-san jose section, Bongabong, or. Mindoro | Bongabong | 2023 | Tapos na | ₱217,122,960 |
| Flood control · Brgy. Inarawan Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio damayan section, brgy. inarawan, Naujan, or. Mindoro | Naujan | 2023 | Tapos na | ₱217,122,876 |
| Flood control · Brgy. Tagumpay Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio bagong buhay sect., brgy. tagumpay, Naujan, or. mind | Naujan | 2023 | Tapos na | ₱217,122,749 |
| Flood control · Brgy. San andres section Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio 3 & 4, brgy. san andres section, Naujan, or. mindo | Naujan | 2023 | Tapos na | ₱217,121,051 |