PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
2,746
sa buong lalawigan
PUBLISHED NA BUDGET
₱77.17 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
89%
2,451 sa 2,746 proyektong may katayuan
LOKASYON
2,487 proyekto ang nasa mapa. 259 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016) | 2016 | ₱316,577,056 |
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
Ipinapakita ang 1,811–1,820 sa 2,746, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction · Brgy. Nasukob Construction of multi-purpose building at barangay nasukob, Bulalacao, Oriental Mindoro | Bulalacao | 2021 | Tapos na | ₱3,959,492 |
| Construction · Brgy. Managpi Construction of multi - purpose building (senior citizen building), barangay managpi, Calapan city, Oriental Mindoro | Calapan City | 2023 | Tapos na | ₱3,959,413 |
| Preventive maintenance - secondary roads - Bongabong - sagana - Roxas -sn aquilino rd - K0105+456 - K0105+574, Bongabong, Oriental Mindoro | Bongabong | 2024 | Tapos na | ₱3,959,007 |
| Construction · Brgy. San francisco Construction of multi-purpose building at barangay san francisco, Bulalacao, Oriental Mindoro | Bulalacao | 2021 | Tapos na | ₱3,958,537 |
| Construction (completion) of multi - purpose building, barangay san agustin 1, Naujan, Oriental Mindoro | Naujan | 2022 | Tapos na | ₱3,957,830 |
| Preventive maintenance of tertiary roads along CSR K0188+000 - K0188+345, K0189+000 - K0189+122, Bulalacao, Oriental Mindoro | Bulalacao | 2018 | Tapos na | ₱3,945,678 |
| Asphalt overlay along CSR jct - Pola road - K0069+995 - K0070+156, Pola, Oriental Mindoro | Pola | 2021 | Tapos na | ₱3,940,330 |
| Construction of multi - purpose building (evacuation center) at Bulalacao, Bulalacao, Oriental Mindoro | Bulalacao | 2021 | Tapos na | ₱3,919,973 |
| Construction · Brgy. Bigaan Construction of multi - purpose building (covered court), brgy. bigaan, San Teodoro, Oriental Mindoro | San Teodoro | 2021 | Tapos na | ₱3,919,951 |
| Construction · Brgy. Marfrancisco Construction of multi - purpose building (barangay hall) at brgy. marfrancisco, Pinamalayan, Oriental Mindoro | Pinamalayan | 2021 | Tapos na | ₱3,919,907 |