PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
314
ayon sa napiling filter
PUBLISHED NA BUDGET
₱14.63 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
83%
261 sa 314 proyektong may katayuan
LOKASYON
305 proyekto ang nasa mapa. 9 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Flood management program- construction/maintenance of flood mitigation structure and drainage systems- const. of road dike/esplanade along pangalaan river (left side), Naujan, or. Mindoro | 2024 | ₱289,496,392 |
| Basic infrastructure program (BIP)- access roads and/or bridges from the national road/s leading to major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase i, Naujan, or. Mindoro | 2024 | ₱287,199,000 |
| Sustainable infrastructure pojects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang ubi river, brgy. tagumpay, phase v, Naujan, or. Mindoro | 2024 | ₱280,178,100 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along dulangan river, brgy. evangelista, phase i, Naujan, Oriental Mindoro | 2024 | ₱280,114,708 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting m,ajor/strategic public buildings/fcilities- const. of road dike along m,ag-asawang tubig river, brgy. tagumpay, phase III, Naujan, Oriental Mindoro | 2024 | ₱280,065,668 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/faciluities- const. of road dike along mag-asawang tubig river, brgy. inarawan, phase IV, Naujan, or. Mindoro | 2024 | ₱279,946,500 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, pjhase IV, Naujan, Oriental Mindoro | 2024 | ₱279,859,650 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy. tagumpay, phase II, Naujan, or. Mindoro | 2024 | ₱279,657,000 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, brgy.inarawan, phase II, Naujan, or. minorto | 2024 | ₱279,423,244 |
| Sustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major strategic public buildings/facilities- construction of bacawan-buhay na tubig-calima road, Pola, or. Mindoro | 2024 | ₱279,377,017 |
Ipinapakita ang 151–160 sa 314, ayon sa published na budget.