Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
340
ayon sa napiling filter
PUBLISHED NA BUDGET
₱5.50 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
100%
340 sa 340 proyektong may katayuan
LOKASYON
340 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Const. of missing link/new roads: Victoria-sablayan (Mindoro cross island road), package i, including bridge, sta. 2+959.90-sta. 3+454.20, bridge length= 494.30 L.M.; sta. 3+454.20-sta. 3+470, approach b length= 15.80 L.M., Victoria, or. Mindoro | 2018 | ₱237,282,858 |
| Road widening of Calapan south road, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640, | 2018 | ₱204,401,157 |
| Road widening of Calapan south road, survey sta.: sta. 74+640-sta. 75+244; sta. 75+275-sta. 79+704; sta. 79+820-sta. 80+599; sta. 80+613-sta. 82+632; sta. 82+651-sta. 83+113; sta. 83+140-sta. 83+511; sta. 83+532-sta. 84+029; rbia sta. KO74+640-KO75+239; k | 2018 | ₱154,188,359 |
| Off-carriageway impv't. of Calapan south road, KO012+400-KO012+960; KO015+162-KO015+791; KO017+210-KO019+206; KO023+560-KO024+985; KO024+1000-KO025+535; KO028+016-KO028+954; KO033+550-KO034+123, or. Mindoro | 2018 | ₱141,836,050 |
| Rehab./concreting of pinagsabangan beach road including drainage, sta. 2+799.00-sta. 6+929.76; sta. 7+409.87-sta. 8+046.49, Oriental Mindoro | 2018 | ₱134,438,666 |
| Construction/improvement of Mansalay public market, brgy. poblacion, Mansalay, Oriental Mindoro | 2018 | ₱128,635,973 |
| Concreting of bante - gatol - abentang, brgy. nasucob access road, Bulalacao, Oriental Mindoro - phase III | 2018 | ₱98,007,273 |
| Construction of flood mitigation structures and drainage system, construction of maragooc seawall, Gloria, Oriental Mindoro | 2018 | ₱96,499,351 |
| Road widening of secondary roads, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), Bansud, Oriental Mindoro | 2018 | ₱96,401,466 |
| Road widening of secondary roads, CSR (K0096+1014 - K0098+150, K0098+166 - K0100+309), Bansud - Bongabong, Oriental Mindoro | 2018 | ₱93,561,626 |
Ipinapakita ang 111–120 sa 340, ayon sa published na budget.