PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
277
ayon sa napiling filter
PUBLISHED NA BUDGET
₱6.50 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
100%
276 sa 277 proyektong may katayuan
LOKASYON
277 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Preventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475 | 2022 | ₱298,184,947 |
| Cluster 12: const./maintenance of flood mitigation structures and drainage systems, Oriental Mindoro, 12.1: const. of balite r/c, brgy. malamig sect., sta. 0+000-sta. 0+308.60; 12.2: const. of cawacat r/c, tabuk sect., Bulalacao, STA.0+000-sta. 0+324.3; 1 | 2022 | ₱289,496,788 |
| Preventive maintenance along Calapan south road, KO064+000-KO069+180, southern Mindoro | 2022 | ₱279,847,370 |
| Rehabilitation/reconstruction of roads with slips, slope collapse and landslide - Calapan north road, KO042+740-KO042+1008, KO043+060-KO043+170, Oriental Mindoro | 2022 | ₱154,882,168 |
| Const. of missing links/new roads - Victoria sablayan (Mindoro cross island road), package i, sta. 0+0472.90-sta. 0+670.30; sta. 0+670.30-sta. 0+771.30, Oriental Mindoro | 2022 | ₱144,749,776 |
| Construction of river control project at subaan river (phase i), sta. 00+000.00-sta. 00+882.60, San Teodoro, Oriental Mindoro | 2022 | ₱144,749,613 |
| Construction of river control project at subaan river (phase II), San Teodoro, Oriental Mindoro, sta. 00+882.60-sta. 02+042.27 | 2022 | ₱144,748,797 |
| Sustainable infrastructure projects alleviating gaps (sipag)-construction of cagancan river control, sta. 0+028-sta. 0+920 (rs); sta. 0+345-sta. 0+920 (ls), brgy. don pedro, Mansalay, Oriental Mindoro | 2022 | ₱144,740,431 |
| Coastal roads/causeway for environmental protection/conservation - construction of Roxas bypass/tourism coastal road at brgy. dangay, sta. 00+000-sta. 00+277.80, Roxas, or. Mindoro | 2022 | ₱136,136,373 |
| Construction/improvement/rehabilitation/completion of various multi-purpose buildings (covered court, brgy. hall, evacuation center), Calapan city, Oriental Mindoro | 2022 | ₱131,722,438 |
Ipinapakita ang 101–110 sa 277, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Rehabilitation · Brgy. Hall Construction/improvement/rehabilitation/completion of various multi - purpose buildings (covered court, brgy. hall, evacuation center), Naujan, Oriental Mindoro | Naujan | 2022 | Tapos na | ₱14,427,743 |
| Road widening - secondary road - Calapan south road - K0138+458.00 - K0138+908.70, Roxas, Oriental Mindoro | Roxas | 2022 | Tapos na | ₱14,217,300 |
| Flood control · Brgy. Hagan Construction/maintenance of flood mitigation structures and drainage system, construction of flood mitigation structure, brgy. hagan, sta. 0+000, sta. 0+112, Bongabong, Oriental Mindoro | Bongabong | 2022 | Tapos na | ₱13,984,346 |
| Rehabilitation/reconstruction of subaan river control, Socorro, Oriental Mindoro | Socorro | 2022 | Tapos na | ₱13,948,743 |
| Road widening along CSR jct-Pola rd - K0068+414 - K0068+732, Pola, Oriental Mindoro | Pola | 2022 | Tapos na | ₱13,248,356 |
| Flood control · Calapan South Road Construction/upgrading/rehabilitation of drainage along Calapan south road K0055+427 - K0056+142, Socorro, Oriental Mindoro | Socorro | 2022 | Tapos na | ₱12,942,526 |
| Construction · Brgy. Happy valley Construction of road at barangay happy valley, Roxas, Oriental Mindoro | Roxas | 2022 | Tapos na | ₱12,869,629 |
| Concreting of roads, Victoria, Oriental Mindoro | Victoria | 2022 | Tapos na | ₱12,739,704 |
| Slope protection · Calapan North Road Rehabilitation/reconstruction of roads with slips, slope collapse and landslide along Calapan north road K0023+300.00 - K0023+320.40, K0023+420.00 - K0023+452.00, K0037+000.00 - K0037+090.00, San Teodoro and Puerto Galera, Oriental Mindoro | – | 2022 | Tapos na | ₱12,551,836 |
| Concreting of brgy. salcedo fmr, brgy. salcedo, Bansud, Oriental Mindoro | Bansud | 2022 | Tapos na | ₱11,939,928 |