PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
29
ayon sa napiling filter
PUBLISHED NA BUDGET
₱4.50 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
97%
28 sa 29 proyektong may katayuan
LOKASYON
29 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,858 |
| Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro | 2023 | ₱289,497,725 |
| Basic infrasructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (paitan section), or. Mindoro | 2023 | ₱247,496,307 |
| Basic infrastucture program- access roads and/or bridges from the national road/s leading to major/strategic public buildings/failities- const. of road dike along dulangan river, (metolza section), or. Mindoro | 2023 | ₱247,495,816 |
| Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of road dike along dulangan river, (evangelista section), Oriental Mindoro | 2023 | ₱247,494,945 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastructures/facilities-const. of dike along dulangan river, sitio bayanan, Naujan, or. Mindoro | 2023 | ₱241,246,776 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, paitan section, Naujan, or. Mindoro | 2023 | ₱241,246,569 |
| Sustainable infrastructure projects alleviating gaps (sipag)- flood mitigation structures protecting public infrastuctures/facilities- const. of dike along dulangan river, evangelista section, Naujan, or. Mindoro | 2023 | ₱241,246,196 |
| Sustainable infrastructure projects alleviating gaps (sipag)-flood mitigation structures protecting public infrastructures/facilities- const. of dike along dulangan river, sitio bagong buhay, Naujan, or. Mindoro | 2023 | ₱241,245,363 |
| Sustainable infrastructure projects alleviating gaps (sipag) flood mitigation structures protecting public infra./facilities- const. of road dike/esplanade along mag-asawang tubig river, sitio ginhawa sect., brgy. tagumpay, Naujan, or. Mindoro | 2023 | ₱221,948,493 |
Ipinapakita ang 1–10 sa 29, ayon sa published na budget.