PROYEKTO
PROYEKTO
PROYEKTO
Ano ang itinayo at magkano ang nakasulat na budget, bayan por bayan, mula sa pampublikong datos.
BILANG NG PROYEKTO
12
ayon sa napiling filter
PUBLISHED NA BUDGET
₱1.30 B
Halaga sa dokumento. Hindi ito ang aktwal na nagastos.
KUMPLETO NA
25%
3 sa 12 proyektong may katayuan
LOKASYON
12 proyekto ang nasa mapa. 0 proyekto ang nasa listahan lamang (walang coordinates). Ang mga punto ay nasa totoong coordinates, kahit hindi tiyak ang bayan.
KADA TAON
BUDGET AYON SA KATAYUAN
Kabuuan ng nakasulat na budget kada katayuan. Hindi ito ang nagastos.
PINAKAMALAKI
| Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. proper, sta. 000+000-sta. 000+368.64, Bansud, or. Mindoro | 2025 | ₱231,451,061 |
| Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. salcedo, sta. 000+229-sta. 000+580 (right side), Bansud, or. Mindoro | 2025 | ₱231,245,468 |
| Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. proper, tiguisan, sta. 000+000-sta. 000+375, Bansud, or. Mindoro | 2025 | ₱231,112,706 |
| Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river, brgy. conrazon, Bansud, or. Mindoro | 2025 | ₱230,119,194 |
| Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river brgy. conrazon (upstream), Bansud, or. Mindoro | 2025 | ₱229,984,205 |
| Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bansud river control structure (downstream), barangay poblacion, Bansud, Oriental Mindoro | 2025 | ₱57,890,510 |
| Construction of army camp road, Bansud, Oriental Mindoro | 2025 | ₱47,706,403 |
| Construction/maintenance of flood mitigation structures and drainage systems, construction of protection works and drainage system, Bansud ris, Bansud, Oriental Mindoro | 2025 | ₱14,679,855 |
| Construction/improvement of access roads leading to declared tourism destinations (tourism road infrastructure - trip), internal access road to sitio palamang, manihala leading to manihala waterfalls II, Bansud, Oriental Mindoro | 2025 | ₱9,694,339 |
| Retrofitting/ strengthening of permanent bridges: pag-asa br. (B00045MR) along Calapan south road Bansud, Oriental Mindoro | 2025 | ₱8,699,960 |
Ipinapakita ang 1–10 sa 12, ayon sa published na budget.
| Proyekto | Bayan | Taon | Katayuan | Published na budget |
|---|---|---|---|---|
| Construction · Brgy. Proper Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. proper, sta. 000+000-sta. 000+368.64, Bansud, or. Mindoro | Bansud | 2025 | Isinasagawa | ₱231,451,061 |
| Construction · Brgy. Salcedo Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. salcedo, sta. 000+229-sta. 000+580 (right side), Bansud, or. Mindoro | Bansud | 2025 | Isinasagawa | ₱231,245,468 |
| Construction · Brgy. Proper Sustainable infrastructure projects alleviating gaps (sipag)- coastal roads to augment resiliency of coastal communities- const. of coastal road/shore protection along brgy. proper, tiguisan, sta. 000+000-sta. 000+375, Bansud, or. Mindoro | Bansud | 2025 | Isinasagawa | ₱231,112,706 |
| Flood control · Brgy. Conrazon Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river, brgy. conrazon, Bansud, or. Mindoro | Bansud | 2025 | Isinasagawa | ₱230,119,194 |
| Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along Bansud river brgy. conrazon (upstream), Bansud, or. Mindoro | Bansud | 2025 | Isinasagawa | ₱229,984,205 |
| Flood control · Brgy. Poblacion Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bansud river control structure (downstream), barangay poblacion, Bansud, Oriental Mindoro | Bansud | 2025 | Isinasagawa | ₱57,890,510 |
| Construction of army camp road, Bansud, Oriental Mindoro | Bansud | 2025 | Isinasagawa | ₱47,706,403 |
| Construction/maintenance of flood mitigation structures and drainage systems, construction of protection works and drainage system, Bansud ris, Bansud, Oriental Mindoro | Bansud | 2025 | Isinasagawa | ₱14,679,855 |
| Construction/improvement of access roads leading to declared tourism destinations (tourism road infrastructure - trip), internal access road to sitio palamang, manihala leading to manihala waterfalls II, Bansud, Oriental Mindoro | Bansud | 2025 | Isinasagawa | ₱9,694,339 |
| Bridge · Calapan South Road Retrofitting/ strengthening of permanent bridges: pag-asa br. (B00045MR) along Calapan south road Bansud, Oriental Mindoro | Bansud | 2025 | Tapos na | ₱8,699,960 |