Skip to content

Flood control · Brgy. San jose section

Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers, construction of Bongabong river control structure, barangay san jose section, Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱29,082,229

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2025
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
BANAYAD CONSTRUCTION SERVICES
Simula
Mar 11, 2025
Katapusan
Jun 20, 2025
TAGAL
101 araw
ID ng proyekto
25EI0029

ORAS

Timeline

Simula

Mar 11, 2025

101 araw mula simula

Katapusan

Jun 20, 2025

LOKASYON

Nasaan ito

Coordinates: 12.66854, 121.44364

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BONGABONG RIVER CONTROL STRUCTURE, BARANGAY SAN JOSE SECTION, BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.