Rehabilitation of drainage canal at sitio sampalocan campamento, Pola,Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱4,949,967
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Pola
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- SMIB CONSTRUCTION
- Simula
- May 21, 2025
- Katapusan
- Oct 18, 2025
- TAGAL
- 150 araw
- ID ng proyekto
- 25ED0178
ORAS
Timeline
Simula
May 21, 2025
150 araw mula simula
Katapusan
Oct 18, 2025
LOKASYON
Nasaan ito
Coordinates: 13.12357, 121.47189
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REHABILITATION OF DRAINAGE CANAL AT SITIO SAMPALOCAN CAMPAMENTO, POLA,ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of Pola r/c and seawall project, Pola, Oriental Mindoro
Tapos naPola2016
₱46.5 M
published na budgetConstruction of casiligan river control, brgy. zone 2, Pola, Oriental Mindoro
Tapos naPola2022
₱7.8 M
published na budgetSustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major strategic public buildings/facilities- construction of bacawan-buhay na tubig-calima road, Pola, or. Mindoro
IsinasagawaPola2024
₱279.4 M
published na budgetSpecial road fund- motor vehicle user's charge (mvuc) as per R.A. 11239- installation of road safety devices (guardrails, solar studs & chevron signs) along Calapan north rd. & CSR jct. Pola rd., cnr K0021+000-K0061+000; CSR jct. Pola K0068+000-K0072+000,
Tapos naPola20232 bahagi ng daan
₱96.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.