Construction of river control structure, bucayao river, managpi section, Calapan city, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱19,299,950
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2025
- Bayan
- Calapan City
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- CEFF TRADING & ENGINEERING SERVICES
- Simula
- Mar 13, 2025
- Katapusan
- May 27, 2025
- TAGAL
- 75 araw
- ID ng proyekto
- 25ED0055
ORAS
Timeline
Simula
Mar 13, 2025
75 araw mula simula
Katapusan
May 27, 2025
LOKASYON
Nasaan ito
Coordinates: 13.32009, 121.20380
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF RIVER CONTROL STRUCTURE, BUCAYAO RIVER, MANAGPI SECTION, CALAPAN CITY, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Canubing II
IsinasagawaCalapan City2025
Basic infrastructure program (BIP)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike/esplanade along dulangan river, brgy. canubing II, sta. 000+000-sta. 000+305.50, Calapan, or. Mindoro
₱236.9 M
published na budgetFlood control · Brgy. Buhuan
Tapos naCalapan City2025
Construction of flood control structure, barangay buhuan, Calapan city, Oriental Mindoro
₱99.0 M
published na budgetConstruction of Calapan city river control, Calapan city, Oriental Mindoro
Tapos naCalapan City2022
₱96.6 M
published na budgetFlood control · Brgy. Gutad
Tapos naCalapan City2025
Construction of flood control structure, barangay gutad, Calapan city, Oriental Mindoro
₱96.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.