Skip to content

Construction · Brgy. Arangin

Construction of river control structure along catuiran river, sitio duluhan section, brgy. arangin, Naujan, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱96,499,978

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2024
Bayan
Naujan
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
SILVERWOLVES CONSTRUCTION CORPORATION
Simula
Feb 8, 2024
Katapusan
Apr 22, 2024
TAGAL
74 araw
ID ng proyekto
24ED0066

ORAS

Timeline

Simula

Feb 8, 2024

74 araw mula simula

Katapusan

Apr 22, 2024

LOKASYON

Nasaan ito

Coordinates: 13.21847, 121.10169

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG CATUIRAN RIVER, SITIO DULUHAN SECTION, BRGY. ARANGIN, NAUJAN, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.