Skip to content

Flood control · Brgy. Sto

Basic infrastructure program (BIP)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike along mag-asawang tubig river, sapaloc section, brgy. sto. nino, sta. 000+000-sta. 000+387.19, Naujan, or. Mindoro

Tapos na

PUBLISHED NA BUDGET

₱247,496,441

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2024
Bayan
Naujan
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
RAYMAN BUILDERS INC.,
Simula
Mar 9, 2024
Katapusan
Aug 15, 2024
TAGAL
159 araw
ID ng proyekto
24E00050

ORAS

Timeline

Simula

Mar 9, 2024

159 araw mula simula

Katapusan

Aug 15, 2024

LOKASYON

Nasaan ito

Coordinates: 13.25231, 121.18719

DETALYE

Detalye ng proyekto

Orihinal na pamagat
BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, SAPALOC SECTION, BRGY. STO. NINO, STA. 000+000-STA. 000+387.19, NAUJAN, OR. MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.