Bridge · Brgy. Ipil
Construction of bridge @ brgy. ipil, Bongabong, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱9,897,354
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2023
- Bayan
- Bongabong
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- ARCHIDUS DEVELOPMENT CORPORATION
- Simula
- Mar 24, 2023
- Katapusan
- Jan 17, 2024
- TAGAL
- 299 araw
- ID ng proyekto
- 23EI0044
ORAS
Timeline
Simula
Mar 24, 2023
299 araw mula simula
Katapusan
Jan 17, 2024
LOKASYON
Nasaan ito
Coordinates: 12.73964, 121.48660
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF BRIDGE @ BRGY. IPIL, BONGABONG, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Bridge program- widening of bridge- orconuma br. (B00217MR) along Bongabong-sagana-Roxas-san aquilino road, Bongabong, or. Mindoro
IsinasagawaBongabong2024
₱156.9 M
published na budgetWidening of permanent bridges- orconuma br. (B00217MR) along Bongabong-sagana-Roxas-san aquilino road (phase II), Bongabong, or. Mindoro
IsinasagawaBongabong2025
₱46.7 M
published na budgetRetrofitting / strengthening of permanent bridges: nawa bridge, morente, Bongabong, Oriental Mindoro
Tapos naBongabong2025
₱28.8 M
published na budgetBridge · Calapan South Road
Tapos naBongabong2017
Widening of bridge - nawa br. (B00061MR) along Calapan south road, Bongabong, Oriental Mindoro
₱28.6 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.