Construction · Brgy. Managpi
Construction of bucayao river control along brgy. managpi, sta. 0+000 - sta. 0+172.48, Calapan city, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱38,599,997
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2023
- Bayan
- Calapan City
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- E.S.L. BUILDERS & PARTS SUPPLY
- Simula
- Mar 29, 2023
- Katapusan
- Sep 18, 2023
- TAGAL
- 173 araw
- ID ng proyekto
- 23ED0030
ORAS
Timeline
Simula
Mar 29, 2023
173 araw mula simula
Katapusan
Sep 18, 2023
LOKASYON
Nasaan ito
Coordinates: 13.31889, 121.20693
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF BUCAYAO RIVER CONTROL ALONG BRGY. MANAGPI, STA. 0+000 - STA. 0+172.48, CALAPAN CITY, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Canubing II
IsinasagawaCalapan City2025
Basic infrastructure program (BIP)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike/esplanade along dulangan river, brgy. canubing II, sta. 000+000-sta. 000+305.50, Calapan, or. Mindoro
₱236.9 M
published na budgetFlood control · Brgy. Buhuan
Tapos naCalapan City2025
Construction of flood control structure, barangay buhuan, Calapan city, Oriental Mindoro
₱99.0 M
published na budgetConstruction of Calapan city river control, Calapan city, Oriental Mindoro
Tapos naCalapan City2022
₱96.6 M
published na budgetFlood control · Brgy. Gutad
Tapos naCalapan City2025
Construction of flood control structure, barangay gutad, Calapan city, Oriental Mindoro
₱96.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.