Flood control · Calapan South Road
Construction/upgrading/rehabilitation of drainage along Calapan south rd - K0042+066 - K0042+471, Victoria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱4,604,035
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2023
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- JCL86 BUILDERS INC.
- Simula
- Mar 30, 2023
- Katapusan
- Jun 27, 2023
- TAGAL
- 89 araw
- ID ng proyekto
- 23ED0021
ORAS
Timeline
Simula
Mar 30, 2023
89 araw mula simula
Katapusan
Jun 27, 2023
LOKASYON
Nasaan ito
Coordinates: 13.12369, 121.29210
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG CALAPAN SOUTH RD - K0042+066 - K0042+471, VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of mag-asawang tubig river control structure, Victoria, Oriental Mindoro
Tapos naVictoria2018
₱46.9 M
published na budgetConstruction of alcate river control, Victoria, Oriental Mindoro
Tapos naVictoria2020
₱31.0 M
published na budgetConstruction · Brgy. Alcate
Tapos naVictoria2016
Construction of alcate river control, brgy. alcate, Victoria, Oriental Mindoro
₱18.7 M
published na budgetConstruction · Brgy. Malabo
Tapos naVictoria2020
Construction of river control at malayas river along brgy. malabo, Victoria, Oriental Mindoro
₱9.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.