Skip to content

Basic infrastructure program- flood mitigation structures protecting public infrastructures/facilities- const. of subaan flood control system, brgy. calsapa-brgy. bigaan section (upstream/rs), Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱98,971,411

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2023
Katayuan
Tapos na
Kategorya
Roads
Contractor
RHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) (41781) / OMNICON BUILDERS
Simula
Apr 13, 2023
Katapusan
Apr 30, 2024
TAGAL
383 araw
ID ng proyekto
23E00169

ORAS

Timeline

Simula

Apr 13, 2023

383 araw mula simula

Katapusan

Apr 30, 2024

LOKASYON

Nasaan ito

Coordinates: 13.42136, 121.01574

DETALYE

Detalye ng proyekto

Orihinal na pamagat
BASIC INFRASTRUCTURE PROGRAM- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SUBAAN FLOOD CONTROL SYSTEM, BRGY. CALSAPA-BRGY. BIGAAN SECTION (UPSTREAM/RS), ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.