Construction/rehabilitation of water supply/ septage and sewerage/ rainwater collector system - rainwater collector system, Pinamalayan - Bulalacao, Oriental Mindoro
Tapos naHindi tiyak ang bayan
PUBLISHED NA BUDGET
₱4,359,466
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2021
- Bayan
- Hindi tiyak ang bayan
- Katayuan
- Tapos na
- Kategorya
- Water Provision and Storage
- Contractor
- J.A. BUILDERS AND SUPPLY
- Simula
- Dec 2, 2022
- Katapusan
- Dec 23, 2022
- TAGAL
- 21 araw
- ID ng proyekto
- 22EI0131
ORAS
Timeline
Simula
Dec 2, 2022
21 araw mula simula
Katapusan
Dec 23, 2022
LOKASYON
Nasaan ito
Coordinates: 12.69473, 121.48979
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR SYSTEM, PINAMALAYAN - BULALACAO, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of water supply system level III, brgys. san antonio, loyal, sampaguita, san cristobal, antonio, pakyas, Victoria, Oriental Mindoro
Tapos naHindi tiyak ang bayan2018
₱28.2 M
published na budgetConstruction of water system level III at leuteboro national high school, Socorro, Oriental Mindoro
Tapos naSocorro2021
₱10.5 M
published na budgetConstruction of solar water system, municipality of Baco, Oriental Mindoro
Tapos naBaco2023
₱9.8 M
published na budgetRehabilitation of Socorro water system main pipelines at zone II - zone IV - catiningan - bagsok main pipelines, Socorro, Oriental Mindoro
Tapos naSocorro2023
₱9.8 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.