Construction of flood control structure, Bongabong river, Bongabong (lisap section), Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,999,964

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION (49131) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)
Simula
Apr 13, 2022
Katapusan
Jul 19, 2023
TAGAL
462 araw
ID ng proyekto
22EI0108

ORAS

Timeline

Simula

Apr 13, 2022

462 araw mula simula

Katapusan

Jul 19, 2023

LOKASYON

Nasaan ito

Coordinates: 12.68227, 121.33019

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BONGABONG (LISAP SECTION), BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.