Bridge · Calapan South Road
Widening of permanent bridges: Bansud br. (B00046MR) along Calapan south road, Bansud, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱67,142,372
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2022
- Bayan
- Bansud
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- LUMEL GLENN CONSTRUCTION (26817) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION)
- Simula
- Mar 7, 2022
- Katapusan
- Jul 28, 2023
- TAGAL
- 508 araw
- ID ng proyekto
- 22EI0081
ORAS
Timeline
Simula
Mar 7, 2022
508 araw mula simula
Katapusan
Jul 28, 2023
LOKASYON
Nasaan ito
Coordinates: 12.85491, 121.45794
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- WIDENING OF PERMANENT BRIDGES: BANSUD BR. (B00046MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Bridge · Calapan South Road
Tapos naBansud2023
Widening of permanent bridges - sumague br. (B00231MR) along Calapan south road, Bansud, Oriental Mindoro
₱48.2 M
published na budgetBridge · Calapan South Road
Tapos naBansud2020
Retrofitting/ strengthening of permanent bridges, Bansud br. (B00046MR) along Calapan south road, Bansud, Oriental Mindoro
₱34.1 M
published na budgetBridge · Calapan South Road
Tapos naBansud2021
Widening of permanent bridge: tiguisan br. (B00049MR) along Calapan south road, Bansud, Oriental Mindoro
₱15.5 M
published na budgetBridge · Calapan South Road
Tapos naBansud2020
Widening of permanent bridges: concepcion br., (B00048MR) along Calapan south road, Bansud, Oriental Mindoro
₱15.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.