Skip to content

Flood control · Brgy. San jose section

Construction of flood mitigation structure - construction of Bongabong river control, barangay san jose section, Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱17,324,354

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
E E CONSTRUCTION
Simula
Feb 16, 2022
Katapusan
Jul 26, 2022
TAGAL
160 araw
ID ng proyekto
22EI0041

ORAS

Timeline

Simula

Feb 16, 2022

160 araw mula simula

Katapusan

Jul 26, 2022

LOKASYON

Nasaan ito

Coordinates: 12.66644, 121.43322

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BONGABONG RIVER CONTROL, BARANGAY SAN JOSE SECTION, BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.