Skip to content

Flood control · Brgy. Sto

Construction/rehabilitation of flood mitigation within major river basins and principal river, construction of pula river control, brgy. sto. niÑo section, sta. 0+000 - sta. 0+534, Pinamalayan Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,999,992

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
L.N. SALVADOR CONSTRUCTION CORP. (FOR: L.N. SALVADOR CONSTRUCTION)
Simula
Jun 6, 2022
Katapusan
Mar 20, 2023
TAGAL
287 araw
ID ng proyekto
22EI0013

ORAS

Timeline

Simula

Jun 6, 2022

287 araw mula simula

Katapusan

Mar 20, 2023

LOKASYON

Nasaan ito

Coordinates: 13.04952, 121.42803

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF PULA RIVER CONTROL, BRGY. STO. NIÑO SECTION, STA. 0+000 - STA. 0+534, PINAMALAYAN ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.