Skip to content

Flood control · Brgy. Luna section

Construction/rehabilitation of flood mitigation facilities within major river basins and principal river, construction of Bongabong river control, brgy. luna section, sta. 0 + 000 - sta. 0 + 334, Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,999,950

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2022
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
TWENTY SIXTEEN CONSTRUCTION AND GENERAL MERCHANDISE (41944) / LUMEL GLENN CONSTRUCTION
Simula
Apr 13, 2022
Katapusan
Jan 17, 2023
TAGAL
279 araw
ID ng proyekto
22EI0012

ORAS

Timeline

Simula

Apr 13, 2022

279 araw mula simula

Katapusan

Jan 17, 2023

LOKASYON

Nasaan ito

Coordinates: 12.67415, 121.47880

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BONGABONG RIVER CONTROL, BRGY. LUNA SECTION, STA. 0 + 000 - STA. 0 + 334, BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.