Construction of flood control, Victoria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱4,899,998
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2022
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- JARO BUILDERS & CONSTRUCTION SUPPLY
- Simula
- Apr 6, 2022
- Katapusan
- May 12, 2022
- TAGAL
- 36 araw
- ID ng proyekto
- 22ED0095
ORAS
Timeline
Simula
Apr 6, 2022
36 araw mula simula
Katapusan
May 12, 2022
LOKASYON
Nasaan ito
Coordinates: 13.16469, 121.28139
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF FLOOD CONTROL, VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of mag-asawang tubig river control structure, Victoria, Oriental Mindoro
Tapos naVictoria2018
₱46.9 M
published na budgetConstruction of alcate river control, Victoria, Oriental Mindoro
Tapos naVictoria2020
₱31.0 M
published na budgetConstruction · Brgy. Alcate
Tapos naVictoria2016
Construction of alcate river control, brgy. alcate, Victoria, Oriental Mindoro
₱18.7 M
published na budgetConstruction · Brgy. Malabo
Tapos naVictoria2020
Construction of river control at malayas river along brgy. malabo, Victoria, Oriental Mindoro
₱9.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.