Bridge · Calapan South Road
Widening of permanent bridges - balud br. (B00010MR) along Calapan south rd., Naujan, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱8,639,175
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2022
- Bayan
- Naujan
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- GREEN ARCTIC BUILDERS
- Simula
- Feb 23, 2022
- Katapusan
- Oct 20, 2022
- TAGAL
- 239 araw
- ID ng proyekto
- 22ED0032
ORAS
Timeline
Simula
Feb 23, 2022
239 araw mula simula
Katapusan
Oct 20, 2022
LOKASYON
Nasaan ito
Coordinates: 13.21561, 121.27154
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- WIDENING OF PERMANENT BRIDGES - BALUD BR. (B00010MR) ALONG CALAPAN SOUTH RD., NAUJAN, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Bridge · Calapan South Road
IsinasagawaNaujan2025
Bridge program- replacement of permanent weak bridges- pinagsabangan br. (B00008MR) along Calapan south road, Naujan, or. Mindoro
₱39.3 M
published na budgetWidening of pinagsabangan br. (B00008MR) along Calapan south rd., Naujan, Oriental Mindoro
Tapos naNaujan2020
₱26.3 M
published na budgetFlood control · Brgy. Metolza section
Tapos naNaujan2023
Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio centro v, brgy. metolza section, Naujan, or. Mindoro
₱289.5 M
published na budgetFlood control · Brgy. Metolza section
Tapos naNaujan2023
Const./maintenance of flood mitigation structures and drainage systems- const. of road dike/esplanade along dulangan river, sitio sili, brgy. metolza section, Naujan, or. Mindoro
₱289.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.