Skip to content

Construction/maintenance of flood mitigation structures and drainage system, construction of happy valley river control, Roxas, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱14,699,919

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Bayan
Roxas
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
MADSAM ENTERPRISES
Simula
Dec 15, 2020
Katapusan
Jun 8, 2021
TAGAL
175 araw
ID ng proyekto
20EI0120

ORAS

Timeline

Simula

Dec 15, 2020

175 araw mula simula

Katapusan

Jun 8, 2021

LOKASYON

Nasaan ito

Coordinates: 12.64372, 121.42254

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF HAPPY VALLEY RIVER CONTROL, ROXAS, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.