Construction/maintenance of flood mitigation structures and drainage system, construction of papandungin river control, Gloria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱24,499,484
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Gloria
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- E E CONSTRUCTION
- Simula
- Dec 11, 2020
- Katapusan
- Jun 17, 2021
- TAGAL
- 188 araw
- ID ng proyekto
- 20EI0119
ORAS
Timeline
Simula
Dec 11, 2020
188 araw mula simula
Katapusan
Jun 17, 2021
LOKASYON
Nasaan ito
Coordinates: 12.94074, 121.43588
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF PAPANDUNGIN RIVER CONTROL, GLORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Papandungin
IsinasagawaGloria2024
Flood management program- construction/rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structures along balete river, phase 2, brgy. papandungin, Gloria, or. Mindoro
₱241.2 M
published na budgetFlood control · Brgy. Papandungin
IsinasagawaGloria2024
Flood management program- const./rehabilitation of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along balete river, phase 1, brgy. papandungin, Gloria, or. Mindoro
₱241.2 M
published na budgetFlood control · Brgy. Balete
IsinasagawaGloria2024
Flood management program- construction/rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along balete river, brgy. balete, Gloria, or. mindorio
₱241.2 M
published na budgetFlood control · Brgy. Papandungin
IsinasagawaGloria2024
Flood management program- const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of flood control structure along balete river, brgy. balete - brgy. papandungin, Gloria, Oriental Mindoro
₱241.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.