Skip to content

Flood control · Brgy. M

Construction/maintenance of flood mitigation structures and drainage system, construction of flood control structure, balite river, brgy. m. adriatico, Gloria, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱24,499,609

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Bayan
Gloria
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
GREEN ISLAND ENTERPRISES
Simula
Dec 11, 2020
Katapusan
May 10, 2021
TAGAL
150 araw
ID ng proyekto
20EI0109

ORAS

Timeline

Simula

Dec 11, 2020

150 araw mula simula

Katapusan

May 10, 2021

LOKASYON

Nasaan ito

Coordinates: 12.93928, 121.43214

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BALITE RIVER, BRGY. M. ADRIATICO, GLORIA, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.