Skip to content

Construction/maintenance of flood mitigation structures and drainage systems, construction of flood control structure/gabion armouring at malamig river, Gloria, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,999,609

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2020
Bayan
Gloria
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
LUMEL GLENN CONSTRUCTION
Simula
Feb 20, 2020
Katapusan
Dec 4, 2020
TAGAL
288 araw
ID ng proyekto
20EI0038

ORAS

Timeline

Simula

Feb 20, 2020

288 araw mula simula

Katapusan

Dec 4, 2020

LOKASYON

Nasaan ito

Coordinates: 12.95250, 121.42325

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/GABION ARMOURING AT MALAMIG RIVER, GLORIA, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.