Construction of two units rainwater collection system (RWCS), Victoria central school, Victoria, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱191,535
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Victoria
- Katayuan
- Tapos na
- Kategorya
- Water Provision and Storage
- Contractor
- FRAMECON BUILDERS
- Simula
- Jun 11, 2020
- Katapusan
- Jul 24, 2020
- TAGAL
- 43 araw
- ID ng proyekto
- 20ED0112
ORAS
Timeline
Simula
Jun 11, 2020
43 araw mula simula
Katapusan
Jul 24, 2020
LOKASYON
Nasaan ito
Coordinates: 13.18679, 121.27651
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF TWO UNITS RAINWATER COLLECTION SYSTEM (RWCS), VICTORIA CENTRAL SCHOOL, VICTORIA, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of two units rainwater collection system (RWCS), fortunato perez high school, Victoria, Oriental Mindoro
Tapos naVictoria2020
₱197,574
published na budgetConstruction of two units rainwater collection system (RWCS), malabo elementary school, Victoria, Oriental Mindoro
Tapos naVictoria2020
₱191,496
published na budgetConstruction of two units rainwater collection system (RWCS), bethel elementary school, Victoria, Oriental Mindoro
Tapos naVictoria2019
₱190,125
published na budgetConstruction of two units rainwater collection system (RWCS), bethel national high school, Victoria, Oriental Mindoro
Tapos naVictoria2019
₱190,010
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.