Construction · Brgy. Bucayao
Construction of bucayao river control, brgy. bucayao, Calapan city, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱33,270,773
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2020
- Bayan
- Calapan City
- Katayuan
- Tapos na
- Kategorya
- Flood Control and Drainage
- Contractor
- FRAMECON BUILDERS
- Simula
- Nov 30, 2020
- Katapusan
- May 10, 2021
- TAGAL
- 161 araw
- ID ng proyekto
- 20ED0079
ORAS
Timeline
Simula
Nov 30, 2020
161 araw mula simula
Katapusan
May 10, 2021
LOKASYON
Nasaan ito
Coordinates: 13.31003, 121.18848
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF BUCAYAO RIVER CONTROL, BRGY. BUCAYAO, CALAPAN CITY, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Flood control · Brgy. Canubing II
IsinasagawaCalapan City2025
Basic infrastructure program (BIP)- flood mitigation structures protecting major/strategic public buildings/facilities- const. of road dike/esplanade along dulangan river, brgy. canubing II, sta. 000+000-sta. 000+305.50, Calapan, or. Mindoro
₱236.9 M
published na budgetFlood control · Brgy. Buhuan
Tapos naCalapan City2025
Construction of flood control structure, barangay buhuan, Calapan city, Oriental Mindoro
₱99.0 M
published na budgetConstruction of Calapan city river control, Calapan city, Oriental Mindoro
Tapos naCalapan City2022
₱96.6 M
published na budgetFlood control · Brgy. Gutad
Tapos naCalapan City2025
Construction of flood control structure, barangay gutad, Calapan city, Oriental Mindoro
₱96.2 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.