Skip to content

Construction/maintenance of flood mitigation structures and drainage systems, construction of flood control structures, (gabions), at san isidro, Bongabong, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱19,598,218

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2019
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
GREEN ISLAND ENTERPRISES
Simula
Jun 23, 2019
Katapusan
Dec 10, 2019
TAGAL
170 araw
ID ng proyekto
19EI0082

ORAS

Timeline

Simula

Jun 23, 2019

170 araw mula simula

Katapusan

Dec 10, 2019

LOKASYON

Nasaan ito

Coordinates: 12.68399, 121.49179

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES, (GABIONS), AT SAN ISIDRO, BONGABONG, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.