Rehabilitation/ reconstruction/upgrading of damaged paved roads along mooecr - K0200+335 - K0200+570, Bulalacao, oriental; Mindoro
Tapos naHindi tiyak ang bayan
PUBLISHED NA BUDGET
₱5,521,044
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2018
- Bayan
- Hindi tiyak ang bayan
- Katayuan
- Tapos na
- Kategorya
- Roads
- Contractor
- RM SESCAR ENTERPRISES
- Simula
- Apr 22, 2018
- Katapusan
- Aug 24, 2018
- TAGAL
- 124 araw
- ID ng proyekto
- 18EI0090
ORAS
Timeline
Simula
Apr 22, 2018
124 araw mula simula
Katapusan
Aug 24, 2018
LOKASYON
Nasaan ito
Coordinates: 12.60248, 121.52407
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MOOECR - K0200+335 - K0200+570, BULALACAO, ORIENTAL; MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Rehab/reconst/upgrading of damaged paved Calapan south rd., or. Mindoro,K0103+000-K0103+594, K0107+(1016)
Tapos naHindi tiyak ang bayan2016
₱316.6 M
published na budgetPreventive maintenance-secondary roads-Calapan south road, KO071+867-KO075+036, KO075+850-KO078+475
Tapos naHindi tiyak ang bayan2022
₱298.2 M
published na budgetPreventive maintenance · Calapan South Road
Tapos naHindi tiyak ang bayan2022
Preventive maintenance along Calapan south road, KO064+000-KO069+180, southern Mindoro
₱279.8 M
published na budgetSustainable infrastructure projects alleviating gaps (sipag)- access roads and/or bridges from the national road/s leading to major strategic public buildings/facilities- construction of bacawan-buhay na tubig-calima road, Pola, or. Mindoro
IsinasagawaPola2024
₱279.4 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.