Bridge · Calapan South Road
Widening of bridge - macanlig br., (B00031MR) along Calapan south road, Pinamalayan, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱18,946,041
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2018
- Bayan
- Pinamalayan
- Katayuan
- Tapos na
- Kategorya
- Bridges
- Contractor
- PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION
- Simula
- May 28, 2018
- Katapusan
- Feb 21, 2019
- TAGAL
- 269 araw
- ID ng proyekto
- 18EI0084
ORAS
Timeline
Simula
May 28, 2018
269 araw mula simula
Katapusan
Feb 21, 2019
LOKASYON
Nasaan ito
Coordinates: 13.04856, 121.43048
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- WIDENING OF BRIDGE - MACANLIG BR., (B00031MR) ALONG CALAPAN SOUTH ROAD, PINAMALAYAN, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Bridge · Brgy. Lumangbayan
Tapos naPinamalayan2020
Construction of two (2) units of 2 lane psdg bridge, brgy. lumangbayan, Pinamalayan, Oriental Mindoro
₱72.4 M
published na budgetBridge · Brgy. Lumangbayan
Tapos naPinamalayan2024
Construction of lumangbayan pcdg bridge, brgy. lumangbayan, Pinamalayan, Oriental Mindoro
₱49.0 M
published na budgetBridge · Calapan South Road
Tapos naPinamalayan2021
Widening of permanent bridges - quinabigan br. (B00035MR) along Calapan south rd., Pinamalayan, Oriental Mindoro
₱30.0 M
published na budgetBridge · Brgy. Sabang
Tapos naPinamalayan2022
Sustainable infrastructure projects alleviating gaps (sipag) - bridges from the national roads, construction of bridge, barangay sabang, Pinamalayan, Oriental Mindoro
₱27.5 M
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.