Skip to content

Construction of flood mitigation structures and drainage systems, construction of san aquilino river control structure, Roxas, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,996,877

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Bayan
Roxas
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
SIXTEEN ENTERPRISES-CALAPAN BRANCH
Simula
Mar 11, 2018
Katapusan
Mar 30, 2019
TAGAL
384 araw
ID ng proyekto
18EI0051

ORAS

Timeline

Simula

Mar 11, 2018

384 araw mula simula

Katapusan

Mar 30, 2019

LOKASYON

Nasaan ito

Coordinates: 12.59460, 121.47426

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN AQUILINO RIVER CONTROL STRUCTURE, ROXAS, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.