Construction of flood mitigation structure with major river basins and principal rivers, construction of balite river control structure, Gloria, Oriental Mindoro

Tapos na

PUBLISHED NA BUDGET

₱48,802,483

Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.

Mahahalagang datos

Taon
2018
Bayan
Gloria
Katayuan
Tapos na
Kategorya
Flood Control and Drainage
Contractor
LUMEL GLENN CONSTRUCTION
Simula
May 28, 2018
Katapusan
Dec 13, 2018
TAGAL
199 araw
ID ng proyekto
18EI0001

ORAS

Timeline

Simula

May 28, 2018

199 araw mula simula

Katapusan

Dec 13, 2018

LOKASYON

Nasaan ito

Coordinates: 12.94465, 121.47482

DETALYE

Detalye ng proyekto

Orihinal na pamagat
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BALITE RIVER CONTROL STRUCTURE, GLORIA, ORIENTAL MINDORO

KATULAD NITO

Mga kaugnay na proyekto

Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.

Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.

Tulungan kaming buuin ang site na ito

Ang site na ito ay ginawa at pinapanatiling updated ng mga volunteer mula sa Oriental Mindoro. Sabihin kung paano ka makakatulong.

Gagamitin lang namin ang detalye mo para kontakin ka tungkol sa pagba-volunteer.