Construction of two units rain water collection system (RWCS) at tigkan elem. school, tigkan, Naujan, Oriental Mindoro
Tapos na
PUBLISHED NA BUDGET
₱154,642
Budget ayon sa dokumento, hindi aktwal na gastos. Published na budget ito, hindi aktwal na gastos, at hindi paratang laban kaninuman.
Mahahalagang datos
- Taon
- 2018
- Bayan
- Naujan
- Katayuan
- Tapos na
- Kategorya
- Water Provision and Storage
- Contractor
- LUMEL GLENN CONSTRUCTION
- Simula
- Jun 11, 2018
- Katapusan
- Aug 3, 2018
- TAGAL
- 53 araw
- ID ng proyekto
- 18ED0158
ORAS
Timeline
Simula
Jun 11, 2018
53 araw mula simula
Katapusan
Aug 3, 2018
LOKASYON
Nasaan ito
Coordinates: 13.28753, 121.18518
DETALYE
Detalye ng proyekto
- Orihinal na pamagat
- CONSTRUCTION OF TWO UNITS RAIN WATER COLLECTION SYSTEM (RWCS) AT TIGKAN ELEM. SCHOOL, TIGKAN, NAUJAN, ORIENTAL MINDORO
KATULAD NITO
Mga kaugnay na proyekto
Parehong bayan o parehong uri ng gawain, pinakamalaking published na budget muna.
Construction of solar water system, municipality of Naujan, Oriental Mindoro
Tapos naNaujan2023
₱9.8 M
published na budgetConstruction of two units rainwater collection system (RWCS), santiago c. garong memorial school, Naujan, Oriental Mindoro
Tapos naNaujan2019
₱190,747
published na budgetConstruction of two units rainwater collection system (RWCS), san isidro elementary school, Naujan, Oriental Mindoro
Tapos naNaujan2019
₱190,696
published na budgetConstruction of two units rainwater collection system (RWCS), porfirio g. comia memorial elementary school, Naujan, Oriental Mindoro
Tapos naNaujan2019
₱190,647
published na budget
Source: DPWH Infrastructure Transparency Dataset via BetterGov Open Data (CC0). Ang bayan ay hinuhulaan mula sa coordinates at pamagat. Balik sa lahat ng proyekto.